Showing posts with label commercial-real-estate. Show all posts
Showing posts with label commercial-real-estate. Show all posts

Tuesday, January 13, 2015

Office Building 1155 N Dairy Ashford Rd Houston, TX 77079







1155 N Dairy Ashford Rd
Houston, TX 77079

Friday, December 26, 2014

SKANSKA office development (Phase I) on Memorial Drive in the Energy Corridor is nearing completion



West Memorial Place
SKANSKA's Memorial Drive office development across from the Terry Hershey Park playground, Pavilion, and Kid Fit Park, is nearing completion. Phase I is scheduled to open in January 2015; Phase II, which is still under construction, a year later.

15375 Memorial Drive; westmemorialplace.com

Terry Hershey Park - Trail to the Pavilion at Playground

New residential construction at SKANSKA site on
Memorial, behind the Office Towers
(South Mayde Creek Dr running parallel to Langham Creek
 and Memorial Loop segment of Terry Hershey Trail)
Emerging Office Building on Memorial
seen from Terry Hershey Park parking lot at the playground
a few months ago


Terry Hershey Park Playground on Memorial with Pavilion
and sundial (view from the North near Kid Fit area Dec 2014)

Black-bellied whistling ducks at the pond on corporate
campus West of the park 

Kid Fit exercise area at Terry Hershey Park
sponsored by BP America

Children's exercise equipment at Terry Hershey Park
South of Katy Freeway inbound frontage road.  

Wednesday, February 20, 2013

Eldridge at Katy Freeway Prime Office Space Development - Ground broken (construction pics)

Backhoe at N. Eldridge Pkwy - Katy Freeway site of new office development project

Construction work (earth-moving and utilities installation work, to be more specific) has commenced on Energy Corridor office building development project that will bring to the West-Houston sub-market more than half a million rentable square feet of premium office space at the SW corner of North Eldridge Parkway and Katy Freeway<-- Follow link to prior blog post with on-location pics of project site. 




This stretch of Eldridge Pkwy just North of Memorial Drive recently saw completion of a road widening road project (additional lanes added), and further road improvements are being implemented on the North side of Interstate 10 on the stretch that runs through the Addicks Reservoir wilderness and connects to Patterson Road, War Memorial Drive (Bear Creek Pioneers Park), and Clay Road, which has proven to be extremely dangerous and accident-prone, especially in wet conditions at night.  



Photo of pre-leasing sign by office property leasing agent with dirt pile at construction site behind it
CBRE Leasing Agent sign and rendition (computer-generated image)
of new office building being erected
at N. Eldridge Pkwy South of  I-10 Katy Fwy inbound feeder road

Thursday, February 14, 2013

Energy Crossing II Construction under way on Katy Freeway Houston-bound feeder road



Energy Crossing II project site with crane - View from Barker Dam
(Feb 10, 2013 photo)
A Lincoln Property Company 8-floor office building project at Highway 6 and Katy Freeway/Grisby Rd.
scheduled to be completed Aug 2013

LPC Energy Crossing Two FOR LEASE sign on Katy Freeway project site

Also see earlier post on Energy Crossing I (existing office building)




Monday, February 4, 2013

Construction Cranes attest to Boom under way West Houston Energy Corridor


Construction cranes can be seen all around the Energy Corridor both North and South of Katy Freeway. New office towers are emerging, others are in the planning stages, and residential multi-family construction continues too, as the projected creation of new jobs or relocation of workers to the new office buildings entails heightened demand for high-end apartment space in the surrounding neighborhoods too.

Crane at BP America's Westlake construction site (early 2013)
Contsruction crane at BP America Westlake Campus between Katy Freeway and Memorial Drive
Construction site is located South of Katy Freeway inbound frontage road
Katy Freeway with Dairy Ashford Rd Exit sign - construction crane in the distance
Construction crane in the distance North of Katy Freeway
at Dairy Ashford 
Construction crane rising above Barker Reservoir in West Houston near Highway 6
Energy Crossing II Office Building  soon to join Energy Crossing I
Photo of  crane at construction site soaring over the Barker Dam

Alliance Residential Company luxury apartment construction site on Eldridge Parkway near Memorial Drive

Parking garage being erected at & Seventy Eldridge Parkway Luxury Apartments coming soon
Construction work ongoing at site of 770 Eldridge Apartment Development Project facing Eldridge Place Office Towers on Eldridge Parkway just South of Memorial Drive




Monday, November 19, 2012

Eldridge Oaks Phase II Project sign posted on property - Completion of Transwestern's 2nd office tower projected for 2014



View of existing Eldridge Oaks Class A Office Building from the
intersection of Enclave Parkway and Eldridge Parkway  
1800 Eldridge - Listing of Corporate Tenants with Lease at Eldridge Oaks
Current tenants at 1080 Eldridge: Kellogg Brown & Root (KBR) and WIPRO

KRB-Leased Eldridge Oaks I Office Building on Eldridge Parkway
Eldridge Oaks Office Complex with KBR lettering at the top (back-lit photo taken with tele-lens at the beginning of this year)


Tuesday, November 13, 2012

900-1000 North Eldridge Parkway at Katy Fwy - New Office Tower site status - still a greenfield, but looking for tenants

2/20/13 UPDATE: Ground broken on the Eldridge-Katy corner parcel office development project in January 2013. Click hyperlink for images from construction site in early stage of earth-moving work.

Construction has yet to begin on brand-new Class A office tower on the SW corner parcel at Katy Freeway and Eldridge Parkway.
  
As of a October 2012, a pile of gravel and a leasing sign were already in place. 



About half a million square feet of prime Energy Corridor office space are to follow in a couple of years.  
In the meantime, cranes are up and running elsewhere along this stretch of the interstate, which is in the midst of a fresh construction boom following the recent recession.


 
The tractor's mission is limited to mowing

Lanes being added on Eldridge Parkway - surfacing ongoing on northbound outer lane
Road widening work ongoing on Eldridge northbound as of 10/23/2012
Neighbors to the North of Katy Freeway: OMNI Hotel and Foster-Wheeler Office Complex





Tuesday, August 28, 2012

Worley Parsons at 575 North Dairy Ashford St - Houston Energy Corridor (photo of building with corporate logo)

Top level of Worley Parsons Building (with corporate signage) at 575 N Dairy Ashford St Houston Texas USA
seen from across Katy Freeway



Worley Parsons West Houston / Energy Corridor office location at North Dairy Ashford
on the GoogleMap with thumbnail pic of building

BP Office Building at Helios Way South of Katy Freeway (photos)

BP Helios Plaza Building (wtih BP logo) looming over Freeway Overpass to Park-and-Ride Lot

BP Office Building at Helios Way - Katy Freeway - Houston TX

Road signage at Helios Way with Katy Freeway in the background
Birds aloft at bp Helios Plaza
BP Helios Plaza Building at dusk (view from Addicks Dam Road)
Chromatically enhanced night view of Helios Plaza Building (September 2012)

Photo of BP Office Building South of Katy Freeway at Helios Way seen from Addicks Dam (daytime view)