Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts
Tuesday, November 11, 2014
Monday, November 19, 2012
Eldridge Oaks Phase II Project sign posted on property - Completion of Transwestern's 2nd office tower projected for 2014
View of existing Eldridge Oaks Class A Office Building from the intersection of Enclave Parkway and Eldridge Parkway |
Current tenants at 1080 Eldridge: Kellogg Brown & Root (KBR) and WIPRO |
Eldridge Oaks Office Complex with KBR lettering at the top (back-lit photo taken with tele-lens at the beginning of this year) |
Monday, August 13, 2012
Now more pedestrian-friendly - Neighborhood walkability enhanced for Enclave Pkwy residents and students at The Village School
Enclave Parkway, which winds its way through the Energy Corridor from the Gentryside neighborhood to Eldridge Parkway is becoming increasingly pedestrian- and bicycle-friendly.
Here are a few recent photos of the segment South of Briar Forest in which the sidewalk infrastructure improvement project has now been completed for a few months. The management of the adjoining apartment complexes are also doing their part to enhance the visual beauty and quality of life in the area with appealing landscaping, although trash pick-up still appears to be a problem in search of a solution.
Sidewalk construction work is currently under way in the Northern segment of Enclave Parkway (North of Briar Forest, where major companies occupy numerous large office buildings on both the East and the West side) to complete the link to the hike & bike trail alongside Eldridge Parkway that connects to the Terry Hershey Trail via a ped-bike bridge over Buffalo Bayou.
Enclave Parkway with new sidewalk near The Village School (Elementary School) at Westella Drive |
Watch-for-crossing-pedestrians warning sign for motorists on the edge of Enclave Parkway going South; new poured-concrete sidewalk and bike lane |
New look of Enclave Parkway South of Briar Forest after completion of 2011 City of Houston sidewalk construction project in this -- mostly residential -- segment of the Parkway. |
Map detail of area covered by 2011 Phase of City of Houston Sidewalk Construction Project on Enclave Parkway |
Subscribe to:
Posts (Atom)