| Northward extension of hike/bike trail from Terry Hershey Park to Addicks Reservoir Construction under way (Feb 15, 2013 photo) |
Showing posts with label commuting-by-bike in Energy Corridor. Show all posts
Showing posts with label commuting-by-bike in Energy Corridor. Show all posts
Tuesday, February 19, 2013
Expansion of bike trail system in West Houston for recreation and even for commuting to work
Thursday, January 31, 2013
Trail Extension to Addicks Dam and West to Highway 6 (Jan 2013 construction pic update)
NEW COMMUTING OPTION FOR ENERGY CORRIDOR
BICYCLE RIDERS IN THE WORKS
Construction work continues on the extension of the Terry Hershey Trail system to connect to the Addicks Dam Road, or rather to a new hike and bike trail being built at the base of the Southern (outside) slope of the dam that will continue on westward to Highway 6, and will provide a new route for bike commuters to and from corporate campuses and energy corridor office buildings.
Here are a few pics taken this month (January 2013) illustrating the status of ongoing earth-moving and construction activity at various points between Terry Hershey Park / Memorial Loop Trail and Addicks Dam, including a panoramic view of the scene at the flow control gate where the reservoir empties into Langham Creek.
Monday, August 13, 2012
Now more pedestrian-friendly - Neighborhood walkability enhanced for Enclave Pkwy residents and students at The Village School
Enclave Parkway, which winds its way through the Energy Corridor from the Gentryside neighborhood to Eldridge Parkway is becoming increasingly pedestrian- and bicycle-friendly.
Here are a few recent photos of the segment South of Briar Forest in which the sidewalk infrastructure improvement project has now been completed for a few months. The management of the adjoining apartment complexes are also doing their part to enhance the visual beauty and quality of life in the area with appealing landscaping, although trash pick-up still appears to be a problem in search of a solution.
Sidewalk construction work is currently under way in the Northern segment of Enclave Parkway (North of Briar Forest, where major companies occupy numerous large office buildings on both the East and the West side) to complete the link to the hike & bike trail alongside Eldridge Parkway that connects to the Terry Hershey Trail via a ped-bike bridge over Buffalo Bayou.
| Enclave Parkway with new sidewalk near The Village School (Elementary School) at Westella Drive |
| Watch-for-crossing-pedestrians warning sign for motorists on the edge of Enclave Parkway going South; new poured-concrete sidewalk and bike lane |
| New look of Enclave Parkway South of Briar Forest after completion of 2011 City of Houston sidewalk construction project in this -- mostly residential -- segment of the Parkway. |
| Map detail of area covered by 2011 Phase of City of Houston Sidewalk Construction Project on Enclave Parkway |
Subscribe to:
Posts (Atom)